Traffic accommodation plans, drafted to the manual.

TAP.Engineer drafts a traffic accommodation plan from the facts of the work, cites every dimension to the page of the manual it came from, and hands you a sheet to review, edit and authenticate.

Tuned for Alberta's roads. Built on the national manuals, so the same method carries across North America.

An 11 by 17 inch plan sheet drafted by the engine: a strip drawing of a Calgary arterial with the left lane closed, dimensioned advance sign spacing, merge taper, buffer, work area and downstream taper, with a sign schedule, device quantities, legend, notes and a title block whose authentication box is empty.
A sheet drafted by the engine: a Calgary arterial at 80 km/h, left lane closed over 120 m. Its rule pack is not yet verified against the manual, and the sheet says so.

Every value has a page number

For each plan the engine lists what it derived, the rule that produced it and the page it rests on. Nothing on the sheet is a number without a source.

This is its output for a Calgary collector at 50 km/h, right lane closed, 40 m of work.

Derived values, City of Calgary Temporary Traffic Control Manual, 2025
Derived valueValuePage
Merge taper length30 mp. 28
Downstream taper length10 mp. 26
Buffer length35 mp. 28
Advance sign spacing50 mp. 28
Device spacing, at most8 mp. 28
Devices on each taper, at least5p. 28
Channelizing deviceconep. 40
Sign size classregularp. 30

Sample output. The Calgary rule pack is version 2025.0.5 and its tables are not yet verified against the manual. A licensed professional engineer verifies every pack before it is released.

How it works

  1. Describe the work

    Road, posted speed, side, length of the work and road class. Driveways and other site features where they matter.

  2. Drafted by rule

    Signs, tapers, buffer, devices and their spacing come from the jurisdiction's pack: the manual's own tables, each with its page.

  3. Checked twice

    A separately written validator checks the layout against the rules. Drawing QA checks the sheet against the plan.

  4. Edit on the canvas

    Move the work area or a sign and the rules place everything again. What you move by hand stays put, and a deviation is recorded with its reason.

  5. Issued for your seal

    An 11 × 17 vector PDF with the strip drawing, sign schedule, device quantities and notes. The authentication box is left for you.

Tuned for Alberta

Release 1 drafts plans for Calgary, Edmonton and Alberta's provincial highways. The manuals of Alberta's other major cities have been read into the knowledge base page by page, so their packs follow.

Coverage across AlbertaA schematic map of Alberta. Calgary and Edmonton are drafted by rule packs today; provincial highways are covered by the provincial pack; Red Deer, Lethbridge, Fort McMurray and Medicine Hat have their manuals read in full; Grande Prairie follows the provincial manual.CalgaryEdmontonRed DeerLethbridgeFort McMurrayMedicine HatGrande Prairie
  • Drafting today
  • Manual read, pack next
  • Follows the provincial manual
  • Provincial highways
Schematic map; highways drawn through a few points.
Coverage schedule, November 2026
Road authorityManualStatus
Alberta Transportation and Economic Corridors provincial highwaysTraffic Accommodation in Work Zones, 2nd edition, 2025Drafting
City of CalgaryTemporary Traffic Control Manual, 2025Drafting
City of EdmontonManual of Temporary Traffic Control, 2023Drafting
City of Red DeerTemporary Traffic Control Manual, September 2025Manual read
City of LethbridgeTemporary Traffic Control ManualManual read
Regional Municipality of Wood Buffalo Fort McMurrayUtility Installation and Traffic Control Manual, 2012Manual read
City of Grande PrairieNo manual of its own: the City's excavation guidance points to the provincial manualProvincial manual
Also read in fullMedicine Hat, St. Albert, Strathcona County, Strathmore, Parkland CountyManual read

The knowledge base holds 120 documents and 4,228 provisions, each tied to the page it came from. A manual read is not a pack: a pack's tables are encoded, tested and verified by a licensed professional engineer before it drafts.

Tuned for Alberta, built for North America

Every plan rests on a national manual: Canada's Manual of Uniform Traffic Control Devices and the United States MUTCD, 11th Edition. A road authority's own rules sit on top as a pack, with its manual's tables, its permit terms and its sign codes.

Because the method is the same everywhere, most North American traffic accommodation work can be drafted this way once the local pack is in place.

Now
Alberta: Calgary, Edmonton, provincial highways
Next
Red Deer, Lethbridge, Wood Buffalo and other Alberta cities
Then
British Columbia and Vancouver, Ontario and Toronto
After
US states on the MUTCD base

The seal stays yours

The software never applies a seal. Every sheet leaves the authentication box empty and lists what the software did not check, so your review starts where the rules stop.

  • Sight distance. That each advance sign and the start of the taper can be seen by approaching drivers.
  • Lateral buffer. The clearance between the work and the open lane.
  • Arrow board. Whether a flashing arrow board is needed at the taper.
  • Sign size and double-signing. Larger signs, or signs on both sides, for the road and its sight lines.

Request early access

TAP.Engineer is in development and opening first to Alberta engineering firms and traffic accommodation designers. Tell us the roads you plan on and the kind of work you accommodate.